Total Time & Date since Last Phase 1-5 Inspection Completed: May 14th 2007 / 36.7 Hours Damage History:
n November 2007 major maintenance was completed at a Citation Service Center in Portland, Oregon by Flightcraft, Inc. Included was a window inspection and replacement of both pilots windshield & pilots side window, installation of a new lead acid battery, repair & servicing of Pilots H.S.I. System, compliance of SB 550-53-16 (Wing Spar carry through Lugs), Bore Scoped both engines, complied with Phase 50 Inspection and several other miscellaneous items. Total cost was over $100,000.00. No Known Damage History | Total Time & Date since Last Phase 1-5 Inspection Completed: May 14th 2007 / 36.7 Hours Damage History:
n November 2007 major maintenance was completed at a Citation Service Center in Portland, Oregon by Flightcraft, Inc. Included was a window inspection and replacement of both pilots windshield & pilots side window, installation of a new lead acid battery, repair & servicing of Pilots H.S.I. System, compliance of SB 550-53-16 (Wing Spar carry through Lugs), Bore Scoped both engines, complied with Phase 50 Inspection and several other miscellaneous items. Total cost was over $100,000.00. No Known Damage History |